ROYAL TERRACE HOTEL, EDINBURGH
Phase 2 of the £3.2million refurbishment is now complete, with the project encompassing all public areas to the ground floor including reception, lounge bar, restaurant, conservatory and banqueting.
In addition, leisure facilities to the lower ground and bedrooms to lower, ground and first floors were undertaken.
Consideration was taken to ensure re-design was sympathetic to the fabric of the hotel, maintaining as many original details as possible.
The resulting interior exudes calm and warmth, a positive relationship between old and new, through the introduction of timeless contemporary detail.
|